BAWANI AL-JAZERA. Construction and fitout. Riyadh, Saudi Arabia.

Construction and fitout under one contract. 43 projects across four Saudi cities.

43Projects on record
4Cities in the Kingdom
3Sectors we build in
1Contract, structure to fitout

Coverage

Projects across Saudi Arabia

Forty-three projects in four cities: Riyadh, Al Taif, Madinah and Hail.

19

Residential Projects

19

Commercial Projects

5

Infrastructure Projects

Aerial view of a residential development under construction, with apartment blocks at structural stage and site roads laid out between them, Al Taif.

Why us

What you get from one contractor

01

Single project leadership

Construction and fitout coordinated under one management team.

02

Saudi-focused delivery

Projects planned and executed to local codes and client requirements.

03

Reliable procurement

Materials sourced from UAE, China, and Türkiye to meet KSA quality standards.

Procurement

Nothing reaches site unapproved

We buy from the United Arab Emirates, China and Türkiye, where the same specification can be met at a better price and a shorter lead time.

What protects a project is not the country a material comes from. It is what the material has to pass before it is allowed on a truck.

  1. The supplier is qualified first

    Test reports, previous supply references and factory capacity are reviewed before a supplier is priced into a package.

    On file: supplier prequalification file, with the test certificates it was approved on.

  2. The consultant approves the item

    Every item goes on the submittal register. Nothing is ordered until it has been approved against the project specification.

    On file: Material Approval Request, signed by the consultant before any order is placed.

  3. Conformity is cleared before shipping

    SABER product and shipment certificates are registered before the container sails. Material that reaches a Saudi port without them is re-exported.

    On file: SABER product certificate and shipment certificate, dated before the bill of lading.

  4. The delivery is checked at the gate

    What arrives is verified against the approved submittal on arrival, not discovered to be wrong after it is installed.

    On file: Material Inspection Request, raised at the gate and closed before anything is released to the crew.

Where we buy, and what for

  • United Arab Emirates

    Regional stock. Fixings, MEP items and finishing materials held close enough that a shortfall is replaced without opening a new import.

    Days by road

  • Türkiye

    Joinery, stone and aluminium. European production standards, and a shared working day when a detail has to be settled with the factory.

    About three weeks by sea

  • China

    Volume packages, used where the drawings are frozen and the quantity is large enough to be worth a production run.

    Five to seven weeks by sea

Next step

Send us what you have

Drawings and a programme if you have them. A sketch and a date is enough to start.

or email info@bawani-aljazera.com

  • A reply within one working day.
  • You speak to the people who would run the job, not a call centre.
  • No obligation, and we say so plainly if it is not work we should take.